{"id":20322,"date":"2022-05-11T16:52:27","date_gmt":"2022-05-11T20:52:27","guid":{"rendered":"https:\/\/www.lean.org\/?post_type=glossary&#038;p=20322"},"modified":"2022-10-10T15:35:58","modified_gmt":"2022-10-10T19:35:58","slug":"hoshin-kanri","status":"publish","type":"glossary","link":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/","title":{"rendered":"Hoshin Kanri"},"content":{"rendered":"\n<p>Hoshin Kanri (aka &#8220;policy deployment&#8221;) is a strategic framework for building sustained high performance and producing results through structured plan-do-check-act (PDCA) thinking. More specifically, it helps organizations define a structure and standards for establishing and executing strategic initiatives throughout the organization. What&#8217;s more, it focuses on developing capability through the strategic delegation of responsibility.<\/p>\n\n\n\n<p>Significantly, hoshin helps organizations align functions and activities to strategic objectives vertically and horizontally \u2014 from the CEO to the front line and across departments. Therefore, every team member understands how their role contributes to the organization\u2019s strategic objectives. As a result, this gives meaning to their work and motivates them toward higher performance. Accordingly, many organizations use hoshin kanri, supported by continuous improvement, to spur creativity and innovation. Consequently, this creates competitive advantage by aligning their workforce toward specific initiatives targeted to achieve leaps in performance.<\/p>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"556\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-1024x556.png\" alt=\"Combining Hoshin Kanri and A3 Management\" class=\"wp-image-19308\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-1024x556.png 1024w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-300x163.png 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-768x417.png 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-150x81.png 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-375x204.png 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-190x103.png 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated-600x326.png 600w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png 1452w\" sizes=\"(max-width: 1024px) 100vw, 1024px\" \/><\/figure><\/div>\n\n\n<h2 class=\"wp-block-heading\">Linking Hoshin Kanri with A3 Problem-Solving<\/h2>\n\n\n\n<p>Combining A3 problem-solving with hoshin kanri is powerful. This is because it helps individuals at each level of the organization \u2014 corporate, departmental, work team, and individual \u2014 identify and solve problems based on organizational priorities established through hoshin kanri. Additionally, the A3 management process supports staff alignment to achieve objectives through consistent communication between leaders and staff.<\/p>\n\n\n\n<p>A3 management centers problem-solving around the A3 report. This is a Toyota-pioneered practice of getting the problem, analysis, corrective actions, and action plan down on a single sheet of large (A3) paper. <\/p>\n\n\n\n<div style=\"height:32px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Five Myths of Implementing Strategy*<\/h2>\n\n\n\n<div style=\"height:27px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<ol><li>Execution equals alignment<\/li><li>Execution means sticking to the plan<\/li><li>Communication equals understanding<\/li><li>A performance culture drives execution<\/li><li>Execution should be driven from the top<\/li><\/ol>\n\n\n\n<p>*Read the Harvard Business Review article here: &#8220;<a href=\"https:\/\/hbr.org\/2015\/03\/why-strategy-execution-unravelsand-what-to-do-about-it\" target=\"_blank\" rel=\"noreferrer noopener\">Why Strategy and Execution Unravels and What to Do About It<\/a>&#8220;<\/p>\n\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">A Guide to Hoshin Kanri<\/h2>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n<div class=\"wp-block-image\">\n<figure class=\"aligncenter size-full is-resized\"><a href=\"https:\/\/info.lean.org\/understanding-hoshin-kanri\"><img loading=\"lazy\" decoding=\"async\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5.jpg\" alt=\"Free ebook download Understanding Hoshin Kanri\" class=\"wp-image-15905\" width=\"822\" height=\"411\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5.jpg 600w, https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5-300x150.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5-150x75.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5-375x188.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2021\/12\/download-hoshin-top-5-190x95.jpg 190w\" sizes=\"(max-width: 822px) 100vw, 822px\" \/><\/a><\/figure><\/div>\n\n\n<div style=\"height:100px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<h2 class=\"wp-block-heading\">Additional Resources on Hoshin Kanri<\/h2>\n\n\n\n<div style=\"height:43px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/the-cascade-of-hoshin\/\"><img loading=\"lazy\" decoding=\"async\" width=\"820\" height=\"640\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4.jpg\" alt=\"Hands moving blocks on a wooden table.\" class=\"wp-image-20340 size-full\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4.jpg 820w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-300x234.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-768x599.jpg 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-150x117.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-375x293.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-190x148.jpg 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_4-600x468.jpg 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\">Article<\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/the-cascade-of-hoshin\/\" target=\"_blank\" rel=\"noreferrer noopener\">The Cascade of Hoshin<\/a><\/h3>\n\n\n\n<p>A gemba walk at a Toyota plant reveals how the company operationalizes its hoshin plan \u2014 in this case, to win the auto industry&#8217;s transition to Mobility 2.0, what Toyota President Akio Toyoda calls a &#8220;once-in-a-century disruption.&#8221;<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/meeting-strategic-objectives\/\"><img loading=\"lazy\" decoding=\"async\" width=\"820\" height=\"640\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1.jpg\" alt=\"Women walking up a series of check boxes toward a bullseye.\" class=\"wp-image-20332 size-full\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1.jpg 820w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-300x234.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-768x599.jpg 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-150x117.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-375x293.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-190x148.jpg 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_1-600x468.jpg 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\">Case Study<\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/meeting-strategic-objectives\/\" target=\"_blank\" rel=\"noreferrer noopener\">Meeting Strategic Objectives<\/a><\/h3>\n\n\n\n<p>Turner Construction uses hoshin kanri (strategy deployment) and A3 problem-solving to create a management system that ensures it achieves its strategic business objectives.<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/breaking-the-cycle-of-ineffective-strategic-planning-and-execution\/\"><img loading=\"lazy\" decoding=\"async\" width=\"820\" height=\"640\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2.jpg\" alt=\"Executive team running through a bullseye\" class=\"wp-image-20333 size-full\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2.jpg 820w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-300x234.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-768x599.jpg 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-150x117.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-375x293.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-190x148.jpg 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_2-600x468.jpg 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\">Case Study <\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/breaking-the-cycle-of-ineffective-strategic-planning-and-execution\/\" target=\"_blank\" rel=\"noreferrer noopener\">Breaking the Cycle of Ineffective Strategic Planning and Execution<\/a><\/h3>\n\n\n\n<p>Bill MacPherson, managing director of Mercer Celgar, a division of Mercer International, describes why hoshin kanri is a better approach to strategy development and execution. Part one of a three-part series.<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/breaking-the-cycle-of-ineffective-strategic-planning-and-execution\/\"><img loading=\"lazy\" decoding=\"async\" width=\"820\" height=\"640\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3.jpg\" alt=\"Executive tripping over a hurdle bar. \" class=\"wp-image-20337 size-full\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3.jpg 820w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-300x234.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-768x599.jpg 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-150x117.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-375x293.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-190x148.jpg 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_3-600x468.jpg 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\">Case Study <\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/addressing-a-critical-problem-in-strategic-planning-and-execution\/\" target=\"_blank\" rel=\"noreferrer noopener\">Addressing a Critical Problem in Strategic Planning and Execution<\/a><\/h3>\n\n\n\n<p>Logoplaste&#8217;s global vice president of lean and strategy deployment describes the experience &#8212; and benefits &#8212; six months into its adoption of the hoshin kanri process (aka strategy development and deployment).<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<div class=\"wp-block-media-text alignwide is-stacked-on-mobile\" style=\"grid-template-columns:42% auto\"><figure class=\"wp-block-media-text__media\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/a-body-needs-skeleton-and-muscle-to-work\/\"><img loading=\"lazy\" decoding=\"async\" width=\"820\" height=\"640\" src=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51.jpg\" alt=\"\" class=\"wp-image-20469 size-full\" srcset=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51.jpg 820w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-300x234.jpg 300w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-768x599.jpg 768w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-150x117.jpg 150w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-375x293.jpg 375w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-190x148.jpg 190w, https:\/\/www.lean.org\/wp-content\/uploads\/2022\/05\/Hoshin_51-600x468.jpg 600w\" sizes=\"(max-width: 820px) 100vw, 820px\" \/><\/a><\/figure><div class=\"wp-block-media-text__content\">\n<h4 class=\"wp-block-heading\">Article <\/h4>\n\n\n\n<h3 class=\"wp-block-heading\"><a href=\"https:\/\/www.lean.org\/the-lean-post\/articles\/a-body-needs-skeleton-and-muscle-to-work\/\" target=\"_blank\" rel=\"noreferrer noopener\">A Body Needs Skeleton and Muscle to Work<\/a><\/h3>\n\n\n\n<p>How do you create alignment across the organization when you have separate departments, value streams, and executives with conflicting priorities? Hoshin kanri. Mark Reich explains.<\/p>\n<\/div><\/div>\n\n\n\n<div style=\"height:22px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Hoshin Kanri (aka &#8220;policy deployment&#8221;) is a strategic framework for building sustained high performance and producing results through structured plan-do-check-act (PDCA) thinking. More specifically, it helps organizations define a structure and standards for establishing and executing strategic initiatives throughout the organization. What&#8217;s more, it focuses on developing capability through the strategic delegation of responsibility. Significantly, [&hellip;]<\/p>\n","protected":false},"author":23,"featured_media":19308,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"_relevanssi_hide_post":"","_relevanssi_hide_content":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"4852,4881,6575,7786,13258,5839","_relevanssi_noindex_reason":"","footnotes":""},"glossary-categories":[],"glossary-tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v22.9 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Hoshin Kanri - Resource Guide | Lean Enterprise Institute<\/title>\n<meta name=\"description\" content=\"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hoshin Kanri - Resource Guide | Lean Enterprise Institute\" \/>\n<meta property=\"og:description\" content=\"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/\" \/>\n<meta property=\"og:site_name\" content=\"Lean Enterprise Institute\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-10T19:35:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1452\" \/>\n\t<meta property=\"og:image:height\" content=\"788\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/\",\"url\":\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/\",\"name\":\"Hoshin Kanri - Resource Guide | Lean Enterprise Institute\",\"isPartOf\":{\"@id\":\"https:\/\/www.lean.org\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png\",\"datePublished\":\"2022-05-11T20:52:27+00:00\",\"dateModified\":\"2022-10-10T19:35:58+00:00\",\"description\":\"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage\",\"url\":\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png\",\"contentUrl\":\"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png\",\"width\":1452,\"height\":788,\"caption\":\"Combining Hoshin Kanri and A3 Management\"},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.lean.org\/#website\",\"url\":\"https:\/\/www.lean.org\/\",\"name\":\"Lean Enterprise Institute\",\"description\":\"Lean Production | Lean Manufacturing | LEI | Lean Services\",\"publisher\":{\"@id\":\"https:\/\/www.lean.org\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.lean.org\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.lean.org\/#organization\",\"name\":\"Lean Enterprise Institute\",\"url\":\"https:\/\/www.lean.org\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/www.lean.org\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.lean.org\/wp-content\/uploads\/2020\/07\/lei_logo.jpg\",\"contentUrl\":\"https:\/\/www.lean.org\/wp-content\/uploads\/2020\/07\/lei_logo.jpg\",\"width\":1500,\"height\":450,\"caption\":\"Lean Enterprise Institute\"},\"image\":{\"@id\":\"https:\/\/www.lean.org\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hoshin Kanri - Resource Guide | Lean Enterprise Institute","description":"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/","og_locale":"en_US","og_type":"article","og_title":"Hoshin Kanri - Resource Guide | Lean Enterprise Institute","og_description":"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.","og_url":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/","og_site_name":"Lean Enterprise Institute","article_modified_time":"2022-10-10T19:35:58+00:00","og_image":[{"width":1452,"height":788,"url":"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png","type":"image\/png"}],"twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/","url":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/","name":"Hoshin Kanri - Resource Guide | Lean Enterprise Institute","isPartOf":{"@id":"https:\/\/www.lean.org\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage"},"image":{"@id":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage"},"thumbnailUrl":"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png","datePublished":"2022-05-11T20:52:27+00:00","dateModified":"2022-10-10T19:35:58+00:00","description":"Hoshin Kanri is a strategic framework for building high performance and producing results through plan-do-check-act (PDCA) thinking.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.lean.org\/lexicon-terms\/hoshin-kanri\/#primaryimage","url":"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png","contentUrl":"https:\/\/www.lean.org\/wp-content\/uploads\/2022\/03\/hoshina3-updated.png","width":1452,"height":788,"caption":"Combining Hoshin Kanri and A3 Management"},{"@type":"WebSite","@id":"https:\/\/www.lean.org\/#website","url":"https:\/\/www.lean.org\/","name":"Lean Enterprise Institute","description":"Lean Production | Lean Manufacturing | LEI | Lean Services","publisher":{"@id":"https:\/\/www.lean.org\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.lean.org\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.lean.org\/#organization","name":"Lean Enterprise Institute","url":"https:\/\/www.lean.org\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.lean.org\/#\/schema\/logo\/image\/","url":"https:\/\/www.lean.org\/wp-content\/uploads\/2020\/07\/lei_logo.jpg","contentUrl":"https:\/\/www.lean.org\/wp-content\/uploads\/2020\/07\/lei_logo.jpg","width":1500,"height":450,"caption":"Lean Enterprise Institute"},"image":{"@id":"https:\/\/www.lean.org\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary\/20322"}],"collection":[{"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary"}],"about":[{"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/types\/glossary"}],"author":[{"embeddable":true,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/users\/23"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/comments?post=20322"}],"version-history":[{"count":9,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary\/20322\/revisions"}],"predecessor-version":[{"id":22550,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary\/20322\/revisions\/22550"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/media\/19308"}],"wp:attachment":[{"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/media?parent=20322"}],"wp:term":[{"taxonomy":"glossary-categories","embeddable":true,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary-categories?post=20322"},{"taxonomy":"glossary-tags","embeddable":true,"href":"https:\/\/www.lean.org\/wp-json\/wp\/v2\/glossary-tags?post=20322"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}